INFORMATIONS
Tallahessee
Seneca Point Road
Canandaigua, NY
Above and at Right: Leo and the Caprini tractor moved the dirt that was stacked on this side of the house (from the  basement)to the back yard. They will start to dig out the top of the basement wall on this side. It was quite weak and crumbling into the basement. They will pour concrete back to top the basement wall. They built the plastic structure on the outside of the house to keep dirt from slouthing back into the basement and have a dry place to work on the top of the basement wall.
Above: New closet framed in front bedroom and bathroom wall in same room reframed. Yes the ceiling goes up...crooked old house.
Below: Back sitting room and bedroom. Floor cut back and new floor beam put in at end of cutoffs. New floor beam will be under the wall and joists extended to meet it. Floor joists very rotted. Floor was sinking at this wall and wall was compressing downward. The entire wall wil be rebuilt.
Click on HOME PAGE button to link to pages of progress by room.